Spacecraft Battery(s) not detected

Electrical Power link with spacecraft is not possible. Visit Manual 548-548

Docking

Station Keeping
Software Version 24.104.1

Orbital Parameter

Altitude 3500 KM
Velocity 2000 m/s


PCO Orbit
Data Check Updated

Station Report Dashboard

Oxygen0%
Water0%
Pressure0 PSI

Uplink / Downlink

Power N/A

Signal Quality

0%

Loss

0%

NASA Data Link
Version 3.3.1

Event Timeline

  • March 25, 2024, 14:00 UTC: Orbital Adjustment Burn (15 min duration).
  • March 26, 2024, 09:00 - 11:00 UTC: Preparation for Cultured Meat Experiment; setup and calibration of bioreactors.
  • March 27, 2024, 10:00 UTC: Thai Holy Basil Germination Start.
  • March 28, 2024, 10:00 UTC: Coolant System Maintenance (2 hours duration).
  • March 28, 2024, 13:00 - 14:00 UTC: Cultured Meat Growth Monitoring.
  • March 29, 2024, 13:00 - 14:00 UTC: Thai Holy Basil Monitoring and Adjustment.
  • March 30, 2024, 15:30 UTC: Cultured Meat Protein Harvest (2 hours duration).

Read Full Timeline & Schedule

Update Data0%
Master
Lighting
0%
Main
Lighting
0%
Ambient
Lighting
0%

Notification 12:32 UTC

Please refer to document JSC104ABD for light replacement during the expedition.

Crews Status

Thomas Weston

Commander

Ken Miyamoto

Pilot

Linlada Sasinpimon

Mission Specialist

Reminder

N/A

Read Full Message

Update Data0%