Spacecraft Battery(s) not detected
Electrical Power link with spacecraft is not possible. Visit Manual 548-548

Docking
Gateway Overview
Station Keeping
Software Version 24.104.1
Orbital Parameter
Altitude 3500 KM
Velocity 2000 m/s
PCO Orbit
Data Check Updated
Station Report Dashboard
Uplink / Downlink
Power N/A
Signal Quality
0%
Loss
0%

NASA Data Link
Version 3.3.1
Event Timeline
- March 25, 2024, 14:00 UTC: Orbital Adjustment Burn (15 min duration).
- March 26, 2024, 09:00 - 11:00 UTC: Preparation for Cultured Meat Experiment; setup and calibration of bioreactors.
- March 27, 2024, 10:00 UTC: Thai Holy Basil Germination Start.
- March 28, 2024, 10:00 UTC: Coolant System Maintenance (2 hours duration).
- March 28, 2024, 13:00 - 14:00 UTC: Cultured Meat Growth Monitoring.
- March 29, 2024, 13:00 - 14:00 UTC: Thai Holy Basil Monitoring and Adjustment.
- March 30, 2024, 15:30 UTC: Cultured Meat Protein Harvest (2 hours duration).
Notification 12:32 UTC
Please refer to document JSC104ABD for light replacement during the expedition.
Crews Status



Thomas Weston
Commander
Ken Miyamoto
Pilot
Linlada Sasinpimon
Mission Specialist