Spacecraft Battery(s) not detected
Electrical Power link with spacecraft is not possible. Visit Manual 548-548
Structural Damage Detected
Detect Structural Damage. Please run check for more information
Docking
Gateway Overview
Station Keeping
Software Version 24.104.1
Orbital Parameter
Altitude 3500 KM
Velocity 2000 m/s
PCO Orbit
Data Check Updated
Station Report Dashboard
Uplink / Downlink
Power N/A
Signal Quality
0%
Loss
0%
NASA Data Link
Version 3.3.1
Event Timeline
- March 25, 2024, 14:00 UTC: Orbital Adjustment Burn (15 min duration).
- March 26, 2024, 09:00 - 11:00 UTC: Preparation for Cultured Meat Experiment; setup and calibration of bioreactors.
- March 27, 2024, 10:00 UTC: Thai Holy Basil Germination Start.
- March 28, 2024, 10:00 UTC: Coolant System Maintenance (2 hours duration).
- March 28, 2024, 13:00 - 14:00 UTC: Cultured Meat Growth Monitoring.
- March 29, 2024, 13:00 - 14:00 UTC: Thai Holy Basil Monitoring and Adjustment.
- March 30, 2024, 15:30 UTC: Cultured Meat Protein Harvest (2 hours duration).
Notification 12:32 UTC
Please refer to document JSC104ABD for light replacement during the expedition.
Crews Status
Thomas Weston
Commander
Ken Miyamoto
Pilot
Linlada Sasinpimon
Mission Specialist
Reminder
...There is perhaps no better demonstration of the folly of human conceits than this distant image of our tiny world. To me, it underscores our responsibility to deal more kindly with one another, and to preserve and cherish the pale blue dot, the only home we've ever known.
from Sagan