Spacecraft Battery(s) not detected

Electrical Power link with spacecraft is not possible. Visit Manual 548-548

Structural Damage Detected

Detect Structural Damage. Please run check for more information

Docking

Station Keeping
Software Version 24.104.1

Orbital Parameter

Altitude 3500 KM
Velocity 2000 m/s


PCO Orbit
Data Check Updated

Station Report Dashboard

Oxygen0%
Water0%
Pressure0 PSI

Uplink / Downlink

Power N/A

Signal Quality

0%

Loss

0%

NASA Data Link
Version 3.3.1

Event Timeline

  • March 25, 2024, 14:00 UTC: Orbital Adjustment Burn (15 min duration).
  • March 26, 2024, 09:00 - 11:00 UTC: Preparation for Cultured Meat Experiment; setup and calibration of bioreactors.
  • March 27, 2024, 10:00 UTC: Thai Holy Basil Germination Start.
  • March 28, 2024, 10:00 UTC: Coolant System Maintenance (2 hours duration).
  • March 28, 2024, 13:00 - 14:00 UTC: Cultured Meat Growth Monitoring.
  • March 29, 2024, 13:00 - 14:00 UTC: Thai Holy Basil Monitoring and Adjustment.
  • March 30, 2024, 15:30 UTC: Cultured Meat Protein Harvest (2 hours duration).

Read Full Timeline & Schedule

Update Data0%
Master
Lighting
0%
Main
Lighting
0%
Ambient
Lighting
0%

Notification 12:32 UTC

Please refer to document JSC104ABD for light replacement during the expedition.

Crews Status

Thomas Weston

Commander

Ken Miyamoto

Pilot

Linlada Sasinpimon

Mission Specialist

Reminder

...There is perhaps no better demonstration of the folly of human conceits than this distant image of our tiny world. To me, it underscores our responsibility to deal more kindly with one another, and to preserve and cherish the pale blue dot, the only home we've ever known.

from Sagan

Read Full Message

Update Data0%